Wrongplacementor alignmentof structuresNotshowingup tomeetingPoor record-keeping ofchangeorders or RFIresponsesNot adheringto buildingcodes orregulationsClashesbetweensubcontractorsMissing orincorrectpermitsHitSprinklerLineMisunderstandingscope of workFailure tonotifystakeholdersof delays orissuesHitDataLineUnsafescaffoldingor fallprotectionInadequateerosioncontrolNon-compliantdrainageinstallationHitPowerLineOver-ordering orunder-orderingmaterialsImproperinspectiondocumentationFailure toupdate projectdocumentationNon-compliancewithenvironmentalregulationsIncorrectconcretemix or poorcuringSmokingOn SitePoor qualitycontrol orfinalinspectionsIgnoringtrafficmanagementnear activeroadsScheduleExtensionRequestLost key toConstructionTrailer Wrongplacementor alignmentof structuresNotshowingup tomeetingPoor record-keeping ofchangeorders or RFIresponsesNot adheringto buildingcodes orregulationsClashesbetweensubcontractorsMissing orincorrectpermitsHitSprinklerLineMisunderstandingscope of workFailure tonotifystakeholdersof delays orissuesHitDataLineUnsafescaffoldingor fallprotectionInadequateerosioncontrolNon-compliantdrainageinstallationHitPowerLineOver-ordering orunder-orderingmaterialsImproperinspectiondocumentationFailure toupdate projectdocumentationNon-compliancewithenvironmentalregulationsIncorrectconcretemix or poorcuringSmokingOn SitePoor qualitycontrol orfinalinspectionsIgnoringtrafficmanagementnear activeroadsScheduleExtensionRequestLost key toConstructionTrailer 

Allied Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
I
2
B
3
I
4
G
5
G
6
B
7
N
8
I
9
G
10
N
11
B
12
N
13
O
14
N
15
B
16
G
17
I
18
O
19
B
20
O
21
O
22
O
23
G
24
I
  1. I-Wrong placement or alignment of structures
  2. B-Not showing up to meeting
  3. I-Poor record-keeping of change orders or RFI responses
  4. G-Not adhering to building codes or regulations
  5. G-Clashes between subcontractors
  6. B-Missing or incorrect permits
  7. N-Hit Sprinkler Line
  8. I-Misunderstanding scope of work
  9. G-Failure to notify stakeholders of delays or issues
  10. N-Hit Data Line
  11. B-Unsafe scaffolding or fall protection
  12. N-Inadequate erosion control
  13. O-Non-compliant drainage installation
  14. N-Hit Power Line
  15. B-Over-ordering or under-ordering materials
  16. G-Improper inspection documentation
  17. I-Failure to update project documentation
  18. O-Non-compliance with environmental regulations
  19. B-Incorrect concrete mix or poor curing
  20. O-Smoking On Site
  21. O-Poor quality control or final inspections
  22. O-Ignoring traffic management near active roads
  23. G-Schedule Extension Request
  24. I-Lost key to Construction Trailer