Wrongplacementor alignmentof structuresIncorrectconcretemix or poorcuringNot adheringto buildingcodes orregulationsSmokingOn SiteOver-ordering orunder-orderingmaterialsLost key toConstructionTrailer HitPowerLineIgnoringtrafficmanagementnear activeroadsMisunderstandingscope of workScheduleExtensionRequestUnsafescaffoldingor fallprotectionPoor record-keeping ofchangeorders or RFIresponsesMissing orincorrectpermitsHitDataLineHitSprinklerLineClashesbetweensubcontractorsPoor qualitycontrol orfinalinspectionsImproperinspectiondocumentationFailure toupdate projectdocumentationFailure tonotifystakeholdersof delays orissuesNon-compliancewithenvironmentalregulationsInadequateerosioncontrolNon-compliantdrainageinstallationNotshowingup tomeetingWrongplacementor alignmentof structuresIncorrectconcretemix or poorcuringNot adheringto buildingcodes orregulationsSmokingOn SiteOver-ordering orunder-orderingmaterialsLost key toConstructionTrailer HitPowerLineIgnoringtrafficmanagementnear activeroadsMisunderstandingscope of workScheduleExtensionRequestUnsafescaffoldingor fallprotectionPoor record-keeping ofchangeorders or RFIresponsesMissing orincorrectpermitsHitDataLineHitSprinklerLineClashesbetweensubcontractorsPoor qualitycontrol orfinalinspectionsImproperinspectiondocumentationFailure toupdate projectdocumentationFailure tonotifystakeholdersof delays orissuesNon-compliancewithenvironmentalregulationsInadequateerosioncontrolNon-compliantdrainageinstallationNotshowingup tomeeting

Allied Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
I
2
B
3
G
4
O
5
B
6
I
7
N
8
O
9
I
10
G
11
B
12
I
13
B
14
N
15
N
16
G
17
O
18
G
19
I
20
G
21
O
22
N
23
O
24
B
  1. I-Wrong placement or alignment of structures
  2. B-Incorrect concrete mix or poor curing
  3. G-Not adhering to building codes or regulations
  4. O-Smoking On Site
  5. B-Over-ordering or under-ordering materials
  6. I-Lost key to Construction Trailer
  7. N-Hit Power Line
  8. O-Ignoring traffic management near active roads
  9. I-Misunderstanding scope of work
  10. G-Schedule Extension Request
  11. B-Unsafe scaffolding or fall protection
  12. I-Poor record-keeping of change orders or RFI responses
  13. B-Missing or incorrect permits
  14. N-Hit Data Line
  15. N-Hit Sprinkler Line
  16. G-Clashes between subcontractors
  17. O-Poor quality control or final inspections
  18. G-Improper inspection documentation
  19. I-Failure to update project documentation
  20. G-Failure to notify stakeholders of delays or issues
  21. O-Non-compliance with environmental regulations
  22. N-Inadequate erosion control
  23. O-Non-compliant drainage installation
  24. B-Not showing up to meeting