uncheckedequipmentboxOrder bysales idstartingwith a 6reasoncode noaccessownedequipmentorderaddeda LOBtooearly tocallremovedCDVLOBinstall wasreferred toconstructionworked anaccount thatwaspreviouslyworkedaddedCIP orFIPadded/removed aplaceholdermovedequipmentfrom atransferwithinSLAnextGenduplicateaccountcreated forsamecustomerlocation notserviceablealreadyactiveleft aVMCAO withnochangesmadepushedcompletiondate out30 dayscreatedan orderthroughOMSpushedoutONU2reasoncodecancelledat check inasked/answered aquestionthroughteamscompletedSODIremoveda proinstallorder wasmissingshippingcodesaddedXumo/Flexdeclinedrefer toconstructionorderremovinga LOBalreadyrescheduledREWIREsenttrendmismatchedvideoequipmentadded NTreasoncodeOrderby a16000cancelledcollectionsor nonpayorder withno truck/self movecodescancelledan ordercheckedfor TPVErr-MissingInspushedcompletiondate out 7dayssetCOMPLETIONdate added/updatedbillingstop/start datetech spotneeded toclose P3 EquipmentPicked up,order stillopenaddedGSKcodesreasoncode CXrefusedalreadycancelledMismatchmodem spokewith CXinboundcallspokewith CXoutbounddropbury,orderRescheduleInstall Apptstackedaccountfraud/invalidTNaddedEQUIPErr-ProInstalReq.comorderuncheckedequipmentboxOrder bysales idstartingwith a 6reasoncode noaccessownedequipmentorderaddeda LOBtooearly tocallremovedCDVLOBinstall wasreferred toconstructionworked anaccount thatwaspreviouslyworkedaddedCIP orFIPadded/removed aplaceholdermovedequipmentfrom atransferwithinSLAnextGenduplicateaccountcreated forsamecustomerlocation notserviceablealreadyactiveleft aVMCAO withnochangesmadepushedcompletiondate out30 dayscreatedan orderthroughOMSpushedoutONU2reasoncodecancelledat check inasked/answered aquestionthroughteamscompletedSODIremoveda proinstallorder wasmissingshippingcodesaddedXumo/Flexdeclinedrefer toconstructionorderremovinga LOBalreadyrescheduledREWIREsenttrendmismatchedvideoequipmentadded NTreasoncodeOrderby a16000cancelledcollectionsor nonpayorder withno truck/self movecodescancelledan ordercheckedfor TPVErr-MissingInspushedcompletiondate out 7dayssetCOMPLETIONdate added/updatedbillingstop/start datetech spotneeded toclose P3 EquipmentPicked up,order stillopenaddedGSKcodesreasoncode CXrefusedalreadycancelledMismatchmodem spokewith CXinboundcallspokewith CXoutbounddropbury,orderRescheduleInstall Apptstackedaccountfraud/invalidTNaddedEQUIPErr-ProInstalReq.comorder

Past pending Bingo - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
  1. unchecked equipment box
  2. Order by sales id starting with a 6
  3. reason code no access
  4. owned equipment
  5. order added a LOB
  6. too early to call
  7. removed CDV LOB
  8. install was referred to construction
  9. worked an account that was previously worked
  10. added CIP or FIP
  11. added/ removed a placeholder
  12. moved equipment from a transfer
  13. within SLA
  14. next Gen
  15. duplicate account created for same customer
  16. location not serviceable
  17. already active
  18. left a VM
  19. CAO with no changes made
  20. pushed completion date out 30 days
  21. created an order through OMS
  22. pushed out ONU2
  23. reason code cancelled at check in
  24. asked/ answered a question through teams
  25. completed SODI
  26. removed a pro install
  27. order was missing shipping codes
  28. added Xumo/ Flex declined
  29. refer to construction
  30. order removing a LOB
  31. already rescheduled
  32. REWIRE
  33. sent trend
  34. mismatched video equipment
  35. added NT reason code
  36. Order by a 16000
  37. cancelled collections or non pay
  38. order with no truck/ self move codes
  39. cancelled an order
  40. checked for TPV
  41. Err-Missing Ins
  42. pushed completion date out 7 days
  43. set COMPLETION date
  44. added/updated billing stop/start date
  45. tech spot needed to close P3
  46. Equipment Picked up, order still open
  47. added GSK codes
  48. reason code CX refused
  49. already cancelled
  50. Mismatch modem
  51. spoke with CX inbound call
  52. spoke with CX outbound
  53. drop bury, order
  54. Reschedule Install Appt
  55. stacked account
  56. fraud/ invalid TN
  57. added EQUIP
  58. Err-Pro Instal Req
  59. .com order