PracticedproperliftingtechniqueUsed safeboxcuttingtechniqueProperlymanagedchutecongestionMaintainedsafe rebintechniqueFollowedone pieceflowIdentifiedand reporteda hazard viaDragonflyKnowscorrectemergencyexit locationsMaintainedproper 5Sin workareaSafelyoperatedpallet jackProperPPEwornMaintainedproper totestackingheightUsed properbodymechanics(nose overtoes)Maintained10 mphspeed limit inthe parkinglotCheckedconditionof workglovesCompletedstretchingexercisesFollowedsafe podinteractionproceduresFree!AvoidedrepetitivemotionstrainDemonstratedproperergonomictechniquesStayedhydratedduringshiftMaintainedproperdunnagehandlingCompletedWorkingWellstretchesProperlysecuredpackages fortransportationWore safetyvest at alltimes inrequiredareasFollowedproper trailerinspectionproceduresPracticedproperliftingtechniqueUsed safeboxcuttingtechniqueProperlymanagedchutecongestionMaintainedsafe rebintechniqueFollowedone pieceflowIdentifiedand reporteda hazard viaDragonflyKnowscorrectemergencyexit locationsMaintainedproper 5Sin workareaSafelyoperatedpallet jackProperPPEwornMaintainedproper totestackingheightUsed properbodymechanics(nose overtoes)Maintained10 mphspeed limit inthe parkinglotCheckedconditionof workglovesCompletedstretchingexercisesFollowedsafe podinteractionproceduresFree!AvoidedrepetitivemotionstrainDemonstratedproperergonomictechniquesStayedhydratedduringshiftMaintainedproperdunnagehandlingCompletedWorkingWellstretchesProperlysecuredpackages fortransportationWore safetyvest at alltimes inrequiredareasFollowedproper trailerinspectionprocedures

Safe to Go - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
  1. Practiced proper lifting technique
  2. Used safe box cutting technique
  3. Properly managed chute congestion
  4. Maintained safe rebin technique
  5. Followed one piece flow
  6. Identified and reported a hazard via Dragonfly
  7. Knows correct emergency exit locations
  8. Maintained proper 5S in work area
  9. Safely operated pallet jack
  10. Proper PPE worn
  11. Maintained proper tote stacking height
  12. Used proper body mechanics (nose over toes)
  13. Maintained 10 mph speed limit in the parking lot
  14. Checked condition of work gloves
  15. Completed stretching exercises
  16. Followed safe pod interaction procedures
  17. Free!
  18. Avoided repetitive motion strain
  19. Demonstrated proper ergonomic techniques
  20. Stayed hydrated during shift
  21. Maintained proper dunnage handling
  22. Completed WorkingWell stretches
  23. Properly secured packages for transportation
  24. Wore safety vest at all times in required areas
  25. Followed proper trailer inspection procedures