Avoided repetitive motion strain Practiced proper lifting technique Identified and reported a hazard via Dragonfly Used proper body mechanics (nose over toes) Maintained proper dunnage handling Completed WorkingWell stretches Stayed hydrated during shift Checked condition of work gloves Properly managed chute congestion Maintained 10 mph speed limit in the parking lot Knows correct emergency exit locations Completed stretching exercises Followed one piece flow Maintained proper 5S in work area Wore safety vest at all times in required areas Followed proper trailer inspection procedures Safely operated pallet jack Proper PPE worn Properly secured packages for transportation Used safe box cutting technique Maintained safe rebin technique Maintained proper tote stacking height Free! Followed safe pod interaction procedures Demonstrated proper ergonomic techniques Avoided repetitive motion strain Practiced proper lifting technique Identified and reported a hazard via Dragonfly Used proper body mechanics (nose over toes) Maintained proper dunnage handling Completed WorkingWell stretches Stayed hydrated during shift Checked condition of work gloves Properly managed chute congestion Maintained 10 mph speed limit in the parking lot Knows correct emergency exit locations Completed stretching exercises Followed one piece flow Maintained proper 5S in work area Wore safety vest at all times in required areas Followed proper trailer inspection procedures Safely operated pallet jack Proper PPE worn Properly secured packages for transportation Used safe box cutting technique Maintained safe rebin technique Maintained proper tote stacking height Free! Followed safe pod interaction procedures Demonstrated proper ergonomic techniques
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Avoided repetitive motion strain
Practiced proper lifting technique
Identified and reported a hazard via Dragonfly
Used proper body mechanics (nose over toes)
Maintained proper dunnage handling
Completed WorkingWell stretches
Stayed hydrated during shift
Checked condition of work gloves
Properly managed chute congestion
Maintained 10 mph speed limit in the parking lot
Knows correct emergency exit locations
Completed stretching exercises
Followed one piece flow
Maintained proper 5S in work area
Wore safety vest at all times in required areas
Followed proper trailer inspection procedures
Safely operated pallet jack
Proper PPE worn
Properly secured packages for transportation
Used safe box cutting technique
Maintained safe rebin technique
Maintained proper tote stacking height
Free!
Followed safe pod interaction procedures
Demonstrated proper ergonomic techniques