Used safe box cutting technique Proper PPE worn Completed WorkingWell stretches Maintained 10 mph speed limit in the parking lot Followed proper trailer inspection procedures Maintained proper dunnage handling Identified and reported a hazard via Dragonfly Avoided repetitive motion strain Properly managed chute congestion Followed one piece flow Practiced proper lifting technique Completed stretching exercises Properly secured packages for transportation Safely operated pallet jack Maintained proper 5S in work area Stayed hydrated during shift Demonstrated proper ergonomic techniques Checked condition of work gloves Maintained safe rebin technique Maintained proper tote stacking height Free! Used proper body mechanics (nose over toes) Wore safety vest at all times in required areas FREE Followed safe pod interaction procedures Knows correct emergency exit locations Used safe box cutting technique Proper PPE worn Completed WorkingWell stretches Maintained 10 mph speed limit in the parking lot Followed proper trailer inspection procedures Maintained proper dunnage handling Identified and reported a hazard via Dragonfly Avoided repetitive motion strain Properly managed chute congestion Followed one piece flow Practiced proper lifting technique Completed stretching exercises Properly secured packages for transportation Safely operated pallet jack Maintained proper 5S in work area Stayed hydrated during shift Demonstrated proper ergonomic techniques Checked condition of work gloves Maintained safe rebin technique Maintained proper tote stacking height Free! Used proper body mechanics (nose over toes) Wore safety vest at all times in required areas FREE Followed safe pod interaction procedures Knows correct emergency exit locations
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Used safe box cutting technique
Proper PPE worn
Completed WorkingWell stretches
Maintained 10 mph speed limit in the parking lot
Followed proper trailer inspection procedures
Maintained proper dunnage handling
Identified and reported a hazard via Dragonfly
Avoided repetitive motion strain
Properly managed chute congestion
Followed one piece flow
Practiced proper lifting technique
Completed stretching exercises
Properly secured packages for transportation
Safely operated pallet jack
Maintained proper 5S in work area
Stayed hydrated during shift
Demonstrated proper ergonomic techniques
Checked condition of work gloves
Maintained safe rebin technique
Maintained proper tote stacking height
Free!
Used proper body mechanics (nose over toes)
Wore safety vest at all times in required areas
FREE
Followed safe pod interaction procedures
Knows correct emergency exit locations