ProperPPEwornPracticedproperliftingtechniqueWore safetyvest at alltimes inrequiredareasMaintainedproper 5Sin workareaUsed safeboxcuttingtechniqueSafelyoperatedpallet jackAvoidedrepetitivemotionstrainCompletedWorkingWellstretchesMaintainedproper totestackingheightMaintained10 mphspeed limit inthe parkinglotCompletedstretchingexercisesFREEFollowedsafe podinteractionproceduresUsed properbodymechanics(nose overtoes)Checkedconditionof workglovesFollowedproper trailerinspectionproceduresIdentifiedand reporteda hazard viaDragonflyStayedhydratedduringshiftMaintainedproperdunnagehandlingFollowedone pieceflowFree!Properlysecuredpackages fortransportationKnowscorrectemergencyexit locationsMaintainedsafe rebintechniqueProperlymanagedchutecongestionDemonstratedproperergonomictechniquesProperPPEwornPracticedproperliftingtechniqueWore safetyvest at alltimes inrequiredareasMaintainedproper 5Sin workareaUsed safeboxcuttingtechniqueSafelyoperatedpallet jackAvoidedrepetitivemotionstrainCompletedWorkingWellstretchesMaintainedproper totestackingheightMaintained10 mphspeed limit inthe parkinglotCompletedstretchingexercisesFREEFollowedsafe podinteractionproceduresUsed properbodymechanics(nose overtoes)Checkedconditionof workglovesFollowedproper trailerinspectionproceduresIdentifiedand reporteda hazard viaDragonflyStayedhydratedduringshiftMaintainedproperdunnagehandlingFollowedone pieceflowFree!Properlysecuredpackages fortransportationKnowscorrectemergencyexit locationsMaintainedsafe rebintechniqueProperlymanagedchutecongestionDemonstratedproperergonomictechniques

Safe to Go - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
  1. Proper PPE worn
  2. Practiced proper lifting technique
  3. Wore safety vest at all times in required areas
  4. Maintained proper 5S in work area
  5. Used safe box cutting technique
  6. Safely operated pallet jack
  7. Avoided repetitive motion strain
  8. Completed WorkingWell stretches
  9. Maintained proper tote stacking height
  10. Maintained 10 mph speed limit in the parking lot
  11. Completed stretching exercises
  12. FREE
  13. Followed safe pod interaction procedures
  14. Used proper body mechanics (nose over toes)
  15. Checked condition of work gloves
  16. Followed proper trailer inspection procedures
  17. Identified and reported a hazard via Dragonfly
  18. Stayed hydrated during shift
  19. Maintained proper dunnage handling
  20. Followed one piece flow
  21. Free!
  22. Properly secured packages for transportation
  23. Knows correct emergency exit locations
  24. Maintained safe rebin technique
  25. Properly managed chute congestion
  26. Demonstrated proper ergonomic techniques