Followedproper trailerinspectionproceduresFollowedone pieceflowProperPPEwornPracticedproperliftingtechniqueDemonstratedproperergonomictechniquesProperlymanagedchutecongestionFollowedsafe podinteractionproceduresSafelyoperatedpallet jackCompletedstretchingexercisesMaintained10 mphspeed limit inthe parkinglotAvoidedrepetitivemotionstrainMaintainedproper 5Sin workareaMaintainedproper totestackingheightUsed safeboxcuttingtechniqueUsed properbodymechanics(nose overtoes)FREEWore safetyvest at alltimes inrequiredareasProperlysecuredpackages fortransportationKnowscorrectemergencyexit locationsMaintainedproperdunnagehandlingIdentifiedand reporteda hazard viaDragonflyFree!Checkedconditionof workglovesCompletedWorkingWellstretchesStayedhydratedduringshiftMaintainedsafe rebintechniqueFollowedproper trailerinspectionproceduresFollowedone pieceflowProperPPEwornPracticedproperliftingtechniqueDemonstratedproperergonomictechniquesProperlymanagedchutecongestionFollowedsafe podinteractionproceduresSafelyoperatedpallet jackCompletedstretchingexercisesMaintained10 mphspeed limit inthe parkinglotAvoidedrepetitivemotionstrainMaintainedproper 5Sin workareaMaintainedproper totestackingheightUsed safeboxcuttingtechniqueUsed properbodymechanics(nose overtoes)FREEWore safetyvest at alltimes inrequiredareasProperlysecuredpackages fortransportationKnowscorrectemergencyexit locationsMaintainedproperdunnagehandlingIdentifiedand reporteda hazard viaDragonflyFree!Checkedconditionof workglovesCompletedWorkingWellstretchesStayedhydratedduringshiftMaintainedsafe rebintechnique

Safe to Go - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
  1. Followed proper trailer inspection procedures
  2. Followed one piece flow
  3. Proper PPE worn
  4. Practiced proper lifting technique
  5. Demonstrated proper ergonomic techniques
  6. Properly managed chute congestion
  7. Followed safe pod interaction procedures
  8. Safely operated pallet jack
  9. Completed stretching exercises
  10. Maintained 10 mph speed limit in the parking lot
  11. Avoided repetitive motion strain
  12. Maintained proper 5S in work area
  13. Maintained proper tote stacking height
  14. Used safe box cutting technique
  15. Used proper body mechanics (nose over toes)
  16. FREE
  17. Wore safety vest at all times in required areas
  18. Properly secured packages for transportation
  19. Knows correct emergency exit locations
  20. Maintained proper dunnage handling
  21. Identified and reported a hazard via Dragonfly
  22. Free!
  23. Checked condition of work gloves
  24. Completed WorkingWell stretches
  25. Stayed hydrated during shift
  26. Maintained safe rebin technique