-Rods movingin differentdirectionsimultaneouslyAND rod motionrequiredGenerator H2pressure less than45 psi and greaterthan 15% RTP,then trip reactor.Less than 15%RTP trip turbineFree!-Rodsstationarywith rodinsertionrequiredUnable torestoreCCW non-SFGD loopManually trip RXprior to manual tripof RCP due to lossof seal injectionand thermalbarrier coolingTurbine bearingmetal temp outsideparameters andgreater than 15%RTP, then trip reactor.Less than 15% RTPtrip turbineSeal oil flow/temptrouble andgreater than 15%RTP, then tripreactor. Less than15% RTP tripturbineTurbine / Generatorhigh vibration andgreater than 15%RTP, then tripreactor. Less than15% RTP, tripturbineFloodingcondenserpit greaterthan 759'RCPtripGridfrequencyless than57.2 HzLoss ofC3 >800MWEHC malfunction withpower fluctuationsand greater than 15%RTP, then trip reactor.Less than 15% RTPtrip turbineHDP Trip>800MWRCS TechSpecleakageexceededCondensertube leakwith highSGBDsodiumEarthquake -groundaccelerationexceeded OBE,Shutdown bothunits to COLDSHUTDOWN.FWP Trip>700MWOutside generatorcapability curveand greater than15% RTP, then tripreactor. Less than15% RTP tripturbineManually tripRX prior tomanual trip ofRCP due tohigh vibrationMultiple HTRMALF/LossEXT STM>900 MWManually trip RXprior to manualtrip of RCP dueto seal waterbearing temphighNo SSWPumpsrunning, priorto trippingRCPsManually tripRX prior tomanual trip ofRCP due toseal inlet temphigh-Rodmotionwith NOdemandLoss maincondenservacuum andpower greater than10%. Less than10% trip turbine.Negative SequenceCurrent greater than12% and greater than15% RTP, then tripreactor. Less than15% RTP trip turbineHPTURBINECASINGDelta THIGHINADVERTENTCLOSURE OF AN HPOR LP STOP ORCONTROL VALVE -Reduce turbine load perIPO-003A/B until ALLoperable HP controlvalve positions indicateless than 100% openLOSS OF ALLSAFETY CHILLEDWATER COOLING -restoration of aSafety Chilled Watertrain expected ingreater than 1 hourManually trip RXprior to manualtrip of RCP dueto operatingoutside RCPparametersLossTPCW andturbine nottrippedLoss of feedand S/G leveldecreasinguncontrolledmanner.PRZR SafetyValves OPEN -PressurizerPressuredecreases inuncontrolledmannerManually tripRX prior tomanual trip ofRCP due tomotor bearingtemp highCondensatePump Trip>700 MWTPCW Head TankLevel Lo/decreasingand power greaterthan 50% ( P9),then trip reactor.Less than P9 tripturbineAlarms on BothGenerator CoreMonitors (GCMs)AND Gen Statmon Temp FaultLIT, and powerless than 900MW-Rodwithdrawal withrod insertiondemand ANDrod motionrequiredSTEAM GENERATORTUBE LEAKAGEGREATER THAN OREQUAL TO 75 GPD -Reduce power to <50% in 1 hour AND Bein MODE 3 in the next2 hours.IF in MODE 1, 2,3, OR 4 ANDInstrument AirHeader pressuredecreases to 35psig OR control ofsystem(s) is lostLP FWHTR BypVlv open>900 MWPW water tempgreater than140EF and greaterthan 15% RTP,then trip reactor.Less than 15%RTP trip turbineCCW pumptrip and SSWin unaffectedtrain will notstart.Trip ofbothMFPsSCR lessthan 765',prior tostoppingCWPsMore thanonedroppedrodRCP HIGH OR LOWLUBE OIL LEVEL - ifoil level low out ofsight - INITIATE ashutdown per IPO-003A/B (ramp to 20%and trip).Liquid level in-leakage faster thancan be drained andgreater than 15%RTP, then trip reactor.Less than 15% RTPtrip turbineShutdownaffected Unitwithin 8 hrs ofexceeding 6.0gpm RCP sealleakoff flowLess thanTWOcirculatingwater pumpsoperatingManually tripRX prior tomanual trip ofRCP due toseal failureLoss ofC2 >800MWGridfrequencygreater than61.8 HzPressurizerLeveldecreases inuncontrolledmanner-Rods movingin differentdirectionsimultaneouslyAND rod motionrequiredGenerator H2pressure less than45 psi and greaterthan 15% RTP,then trip reactor.Less than 15%RTP trip turbineFree!-Rodsstationarywith rodinsertionrequiredUnable torestoreCCW non-SFGD loopManually trip RXprior to manual tripof RCP due to lossof seal injectionand thermalbarrier coolingTurbine bearingmetal temp outsideparameters andgreater than 15%RTP, then trip reactor.Less than 15% RTPtrip turbineSeal oil flow/temptrouble andgreater than 15%RTP, then tripreactor. Less than15% RTP tripturbineTurbine / Generatorhigh vibration andgreater than 15%RTP, then tripreactor. Less than15% RTP, tripturbineFloodingcondenserpit greaterthan 759'RCPtripGridfrequencyless than57.2 HzLoss ofC3 >800MWEHC malfunction withpower fluctuationsand greater than 15%RTP, then trip reactor.Less than 15% RTPtrip turbineHDP Trip>800MWRCS TechSpecleakageexceededCondensertube leakwith highSGBDsodiumEarthquake -groundaccelerationexceeded OBE,Shutdown bothunits to COLDSHUTDOWN.FWP Trip>700MWOutside generatorcapability curveand greater than15% RTP, then tripreactor. Less than15% RTP tripturbineManually tripRX prior tomanual trip ofRCP due tohigh vibrationMultiple HTRMALF/LossEXT STM>900 MWManually trip RXprior to manualtrip of RCP dueto seal waterbearing temphighNo SSWPumpsrunning, priorto trippingRCPsManually tripRX prior tomanual trip ofRCP due toseal inlet temphigh-Rodmotionwith NOdemandLoss maincondenservacuum andpower greater than10%. Less than10% trip turbine.Negative SequenceCurrent greater than12% and greater than15% RTP, then tripreactor. Less than15% RTP trip turbineHPTURBINECASINGDelta THIGHINADVERTENTCLOSURE OF AN HPOR LP STOP ORCONTROL VALVE -Reduce turbine load perIPO-003A/B until ALLoperable HP controlvalve positions indicateless than 100% openLOSS OF ALLSAFETY CHILLEDWATER COOLING -restoration of aSafety Chilled Watertrain expected ingreater than 1 hourManually trip RXprior to manualtrip of RCP dueto operatingoutside RCPparametersLossTPCW andturbine nottrippedLoss of feedand S/G leveldecreasinguncontrolledmanner.PRZR SafetyValves OPEN -PressurizerPressuredecreases inuncontrolledmannerManually tripRX prior tomanual trip ofRCP due tomotor bearingtemp highCondensatePump Trip>700 MWTPCW Head TankLevel Lo/decreasingand power greaterthan 50% ( P9),then trip reactor.Less than P9 tripturbineAlarms on BothGenerator CoreMonitors (GCMs)AND Gen Statmon Temp FaultLIT, and powerless than 900MW-Rodwithdrawal withrod insertiondemand ANDrod motionrequiredSTEAM GENERATORTUBE LEAKAGEGREATER THAN OREQUAL TO 75 GPD -Reduce power to <50% in 1 hour AND Bein MODE 3 in the next2 hours.IF in MODE 1, 2,3, OR 4 ANDInstrument AirHeader pressuredecreases to 35psig OR control ofsystem(s) is lostLP FWHTR BypVlv open>900 MWPW water tempgreater than140EF and greaterthan 15% RTP,then trip reactor.Less than 15%RTP trip turbineCCW pumptrip and SSWin unaffectedtrain will notstart.Trip ofbothMFPsSCR lessthan 765',prior tostoppingCWPsMore thanonedroppedrodRCP HIGH OR LOWLUBE OIL LEVEL - ifoil level low out ofsight - INITIATE ashutdown per IPO-003A/B (ramp to 20%and trip).Liquid level in-leakage faster thancan be drained andgreater than 15%RTP, then trip reactor.Less than 15% RTPtrip turbineShutdownaffected Unitwithin 8 hrs ofexceeding 6.0gpm RCP sealleakoff flowLess thanTWOcirculatingwater pumpsoperatingManually tripRX prior tomanual trip ofRCP due toseal failureLoss ofC2 >800MWGridfrequencygreater than61.8 HzPressurizerLeveldecreases inuncontrolledmanner

ABN/ALM Trip or Downpower - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
  1. -Rods moving in different direction simultaneously AND rod motion required
  2. Generator H2 pressure less than 45 psi and greater than 15% RTP, then trip reactor. Less than 15% RTP trip turbine
  3. Free!
  4. -Rods stationary with rod insertion required
  5. Unable to restore CCW non-SFGD loop
  6. Manually trip RX prior to manual trip of RCP due to loss of seal injection and thermal barrier cooling
  7. Turbine bearing metal temp outside parameters and greater than 15% RTP, then trip reactor. Less than 15% RTP trip turbine
  8. Seal oil flow/temp trouble and greater than 15% RTP, then trip reactor. Less than 15% RTP trip turbine
  9. Turbine / Generator high vibration and greater than 15% RTP, then trip reactor. Less than 15% RTP, trip turbine
  10. Flooding condenser pit greater than 759'
  11. RCP trip
  12. Grid frequency less than 57.2 Hz
  13. Loss of C3 >800 MW
  14. EHC malfunction with power fluctuations and greater than 15% RTP, then trip reactor. Less than 15% RTP trip turbine
  15. HDP Trip >800 MW
  16. RCS Tech Spec leakage exceeded
  17. Condenser tube leak with high SGBD sodium
  18. Earthquake - ground acceleration exceeded OBE, Shutdown both units to COLD SHUTDOWN.
  19. FWP Trip >700 MW
  20. Outside generator capability curve and greater than 15% RTP, then trip reactor. Less than 15% RTP trip turbine
  21. Manually trip RX prior to manual trip of RCP due to high vibration
  22. Multiple HTR MALF/Loss EXT STM >900 MW
  23. Manually trip RX prior to manual trip of RCP due to seal water bearing temp high
  24. No SSW Pumps running, prior to tripping RCPs
  25. Manually trip RX prior to manual trip of RCP due to seal inlet temp high
  26. -Rod motion with NO demand
  27. Loss main condenser vacuum and power greater than 10%. Less than 10% trip turbine.
  28. Negative Sequence Current greater than 12% and greater than 15% RTP, then trip reactor. Less than 15% RTP trip turbine
  29. HP TURBINE CASING Delta T HIGH
  30. INADVERTENT CLOSURE OF AN HP OR LP STOP OR CONTROL VALVE - Reduce turbine load per IPO-003A/B until ALL operable HP control valve positions indicate less than 100% open
  31. LOSS OF ALL SAFETY CHILLED WATER COOLING - restoration of a Safety Chilled Water train expected in greater than 1 hour
  32. Manually trip RX prior to manual trip of RCP due to operating outside RCP parameters
  33. Loss TPCW and turbine not tripped
  34. Loss of feed and S/G level decreasing uncontrolled manner.
  35. PRZR Safety Valves OPEN - Pressurizer Pressure decreases in uncontrolled manner
  36. Manually trip RX prior to manual trip of RCP due to motor bearing temp high
  37. Condensate Pump Trip >700 MW
  38. TPCW Head Tank Level Lo/decreasing and power greater than 50% ( P9), then trip reactor. Less than P9 trip turbine
  39. Alarms on Both Generator Core Monitors (GCMs) AND Gen Stat mon Temp Fault LIT, and power less than 900MW
  40. -Rod withdrawal with rod insertion demand AND rod motion required
  41. STEAM GENERATOR TUBE LEAKAGE GREATER THAN OR EQUAL TO 75 GPD - Reduce power to < 50% in 1 hour AND Be in MODE 3 in the next 2 hours.
  42. IF in MODE 1, 2, 3, OR 4 AND Instrument Air Header pressure decreases to 35 psig OR control of system(s) is lost
  43. LP FW HTR Byp Vlv open >900 MW
  44. PW water temp greater than 140EF and greater than 15% RTP, then trip reactor. Less than 15% RTP trip turbine
  45. CCW pump trip and SSW in unaffected train will not start.
  46. Trip of both MFPs
  47. SCR less than 765', prior to stopping CWPs
  48. More than one dropped rod
  49. RCP HIGH OR LOW LUBE OIL LEVEL - if oil level low out of sight - INITIATE a shutdown per IPO-003A/B (ramp to 20% and trip).
  50. Liquid level in-leakage faster than can be drained and greater than 15% RTP, then trip reactor. Less than 15% RTP trip turbine
  51. Shutdown affected Unit within 8 hrs of exceeding 6.0 gpm RCP seal leakoff flow
  52. Less than TWO circulating water pumps operating
  53. Manually trip RX prior to manual trip of RCP due to seal failure
  54. Loss of C2 >800 MW
  55. Grid frequency greater than 61.8 Hz
  56. Pressurizer Level decreases in uncontrolled manner