Capital Intensive De- centralised Stock Just-in- Time Reduced Waste and Quality is Maximised Operating System Raw Materials Lead Time Labour Intensive Re- order Quantity Job Production Maximum Stock Level Finance Available Finished Goods Too Much Stock Flow Production Too Little Stock Stock Take Minimum Stock Level Re- order Level Batch Production Work-in- progress Automation Mechan- isation Rotation Centralised Stock Capital Intensive De- centralised Stock Just-in- Time Reduced Waste and Quality is Maximised Operating System Raw Materials Lead Time Labour Intensive Re- order Quantity Job Production Maximum Stock Level Finance Available Finished Goods Too Much Stock Flow Production Too Little Stock Stock Take Minimum Stock Level Re- order Level Batch Production Work-in- progress Automation Mechan- isation Rotation Centralised Stock
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Capital Intensive
De-centralised Stock
Just-in-Time
Reduced Waste and Quality is Maximised
Operating System
Raw Materials
Lead Time
Labour Intensive
Re-order Quantity
Job Production
Maximum Stock Level
Finance Available
Finished Goods
Too Much Stock
Flow Production
Too Little Stock
Stock Take
Minimum Stock Level
Re-order Level
Batch Production
Work-in-progress
Automation
Mechan-isation
Rotation
Centralised Stock