ReviewSpecificationsEndVacationOldHighlightInteriorsTodayScheduleCAArchitectureShopDrawingsDesignPreliminarySite2026CD'sSchematicFinalSubmittalDateGoodideaBeginPossibleNotyetHolidayUpdatePunchDecemberProgressHardwareBidUpdateNewFinishThatdidHappenMarketingNextweekEngineerConsultantProjectOngoingRevisedDrawingCheckRedlinesI needto checkon thatProgressCoordinateChangeDocumentsReportCostThisweekProcessBudgetHoursFloatSiteVisitReviewSpecificationsEndVacationOldHighlightInteriorsTodayScheduleCAArchitectureShopDrawingsDesignPreliminarySite2026CD'sSchematicFinalSubmittalDateGoodideaBeginPossibleNotyetHolidayUpdatePunchDecemberProgressHardwareBidUpdateNewFinishThatdidHappenMarketingNextweekEngineerConsultantProjectOngoingRevisedDrawingCheckRedlinesI needto checkon thatProgressCoordinateChangeDocumentsReportCostThisweekProcessBudgetHoursFloatSiteVisit

Studio Meeting - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
  1. Review
  2. Specifications
  3. End
  4. Vacation
  5. Old
  6. Highlight
  7. Interiors
  8. Today
  9. Schedule
  10. CA
  11. Architecture
  12. Shop Drawings
  13. Design
  14. Preliminary
  15. Site
  16. 2026
  17. CD's
  18. Schematic
  19. Final
  20. Submittal
  21. Date
  22. Good idea
  23. Begin
  24. Possible
  25. Not yet
  26. Holiday
  27. Update
  28. Punch
  29. December
  30. Progress
  31. Hardware
  32. Bid
  33. Update
  34. New
  35. Finish
  36. That did Happen
  37. Marketing
  38. Next week
  39. Engineer
  40. Consultant
  41. Project
  42. Ongoing
  43. Revised
  44. Drawing
  45. Check
  46. Redlines
  47. I need to check on that
  48. Progress
  49. Coordinate
  50. Change
  51. Documents
  52. Report
  53. Cost
  54. This week
  55. Process
  56. Budget
  57. Hours
  58. Float
  59. Site Visit