HighlightMarketingRevisedReviewOldUpdateSiteVisitInteriorsProgressProcessBudgetI needto checkon that2026SchematicScheduleNewEndHolidayThatdidHappenArchitectureFloatDocumentsThisweekSubmittalChangeShopDrawingsPreliminaryCheckEngineerBidVacationHoursDrawingHardwareSpecificationsDecemberCoordinateFinishBeginGoodideaPossibleRedlinesDesignPunchProgressProjectCostTodayFinalDateReportConsultantNotyetSiteCANextweekOngoingUpdateCD'sHighlightMarketingRevisedReviewOldUpdateSiteVisitInteriorsProgressProcessBudgetI needto checkon that2026SchematicScheduleNewEndHolidayThatdidHappenArchitectureFloatDocumentsThisweekSubmittalChangeShopDrawingsPreliminaryCheckEngineerBidVacationHoursDrawingHardwareSpecificationsDecemberCoordinateFinishBeginGoodideaPossibleRedlinesDesignPunchProgressProjectCostTodayFinalDateReportConsultantNotyetSiteCANextweekOngoingUpdateCD's

Studio Meeting - Call List

(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
  1. Highlight
  2. Marketing
  3. Revised
  4. Review
  5. Old
  6. Update
  7. Site Visit
  8. Interiors
  9. Progress
  10. Process
  11. Budget
  12. I need to check on that
  13. 2026
  14. Schematic
  15. Schedule
  16. New
  17. End
  18. Holiday
  19. That did Happen
  20. Architecture
  21. Float
  22. Documents
  23. This week
  24. Submittal
  25. Change
  26. Shop Drawings
  27. Preliminary
  28. Check
  29. Engineer
  30. Bid
  31. Vacation
  32. Hours
  33. Drawing
  34. Hardware
  35. Specifications
  36. December
  37. Coordinate
  38. Finish
  39. Begin
  40. Good idea
  41. Possible
  42. Redlines
  43. Design
  44. Punch
  45. Progress
  46. Project
  47. Cost
  48. Today
  49. Final
  50. Date
  51. Report
  52. Consultant
  53. Not yet
  54. Site
  55. CA
  56. Next week
  57. Ongoing
  58. Update
  59. CD's