PH120: Architect's Role Bingo

PH120: Architect's Role Bingo Card
Preview

This bingo card has a free space and 50 words: Articulation, Mock-up, Can-do attitude, Corequisites, Continuous insulation, Thermal bridging, Energy recovery ventilation, Condensation risk, Energy model, Form factor, Blower door testing, Air Control Layer, Thermal Control Layer, Bulk Water Control Layer, Vapor Control Layer, Water Shedding Layer, U-value, Simulated double hung, Compartmentalization, Material substitutions, Integrated project delivery, Constructability reviews, Low load buildings, All-electric ready, Balanced ventilation, Ductwork tightness, Design charrettes, As-built energy model, Feasibility study, Tilt and turn window, Podium construction, Vented dryer, Vapor-open WRB, SS fasteners, Performance-based, WUFI, PHPP, Moisture diffusion, Airtightness budget, Psi value, Trash chutes, Plenums and chases, Enerphit, Energy Star, Ind, Division 01, Kickoff meeting, Indoor Air Plus, Oversized equipment and CAR dampers.

More like this:

STONE | Earth and Human Activity Game 2 | Chapter 4 Fire behavior | Water Cycle | Water Cycle Review

Play Online

Share this URL with your players:

For more control of your online game, create a clone of this card first.

Learn how to conduct a bingo game.

Call List

Probabilities

With players vying for a you'll have to call about __ items before someone wins. There's a __% chance that a lucky player would win after calling __ items.

Tip: If you want your game to last longer (on average), add more unique words/images to it.