Can-do attitude Material substitutions Corequisites U- value Air Control Layer Bulk Water Control Layer CAR dampers All- electric ready Energy Star Integrated project delivery Vapor Control Layer Trash chutes Tilt and turn window Balanced ventilation SS fasteners Energy recovery ventilation As-built energy model Enerphit Psi value Ductwork tightness Form factor Mock- up Moisture diffusion PHPP Constructability reviews Low load buildings Podium construction Kickoff meeting Airtightness budget Vapor- open WRB Water Shedding Layer Indoor Air Plus Continuous insulation Condensation risk Thermal bridging Oversized equipment Thermal Control Layer Vented dryer Energy model Simulated double hung Ind Division 01 WUFI Blower door testing Feasibility study Performance- based Design charrettes Compartmentalization Articulation Plenums and chases Can-do attitude Material substitutions Corequisites U- value Air Control Layer Bulk Water Control Layer CAR dampers All- electric ready Energy Star Integrated project delivery Vapor Control Layer Trash chutes Tilt and turn window Balanced ventilation SS fasteners Energy recovery ventilation As-built energy model Enerphit Psi value Ductwork tightness Form factor Mock- up Moisture diffusion PHPP Constructability reviews Low load buildings Podium construction Kickoff meeting Airtightness budget Vapor- open WRB Water Shedding Layer Indoor Air Plus Continuous insulation Condensation risk Thermal bridging Oversized equipment Thermal Control Layer Vented dryer Energy model Simulated double hung Ind Division 01 WUFI Blower door testing Feasibility study Performance- based Design charrettes Compartmentalization Articulation Plenums and chases
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Can-do attitude
Material substitutions
Corequisites
U-value
Air Control Layer
Bulk Water Control Layer
CAR dampers
All-electric ready
Energy Star
Integrated project delivery
Vapor Control Layer
Trash chutes
Tilt and turn window
Balanced ventilation
SS fasteners
Energy recovery ventilation
As-built energy model
Enerphit
Psi value
Ductwork tightness
Form factor
Mock-up
Moisture diffusion
PHPP
Constructability reviews
Low load buildings
Podium construction
Kickoff meeting
Airtightness budget
Vapor-open WRB
Water Shedding Layer
Indoor Air Plus
Continuous insulation
Condensation risk
Thermal bridging
Oversized equipment
Thermal Control Layer
Vented dryer
Energy model
Simulated double hung
Ind
Division 01
WUFI
Blower door testing
Feasibility study
Performance-based
Design charrettes
Compartmentalization
Articulation
Plenums and chases