Division 01 Ductwork tightness Trash chutes Podium construction Enerphit Oversized equipment Constructability reviews CAR dampers Low load buildings As-built energy model Can-do attitude Design charrettes SS fasteners Simulated double hung Plenums and chases Energy model WUFI PHPP Moisture diffusion Vapor Control Layer Compartmentalization Corequisites Energy Star Feasibility study Balanced ventilation Material substitutions Indoor Air Plus Ind Vented dryer Integrated project delivery Water Shedding Layer Tilt and turn window All- electric ready Performance- based Continuous insulation Mock- up Bulk Water Control Layer Blower door testing Airtightness budget Kickoff meeting Psi value Air Control Layer Articulation Condensation risk Energy recovery ventilation U- value Thermal bridging Vapor- open WRB Form factor Thermal Control Layer Division 01 Ductwork tightness Trash chutes Podium construction Enerphit Oversized equipment Constructability reviews CAR dampers Low load buildings As-built energy model Can-do attitude Design charrettes SS fasteners Simulated double hung Plenums and chases Energy model WUFI PHPP Moisture diffusion Vapor Control Layer Compartmentalization Corequisites Energy Star Feasibility study Balanced ventilation Material substitutions Indoor Air Plus Ind Vented dryer Integrated project delivery Water Shedding Layer Tilt and turn window All- electric ready Performance- based Continuous insulation Mock- up Bulk Water Control Layer Blower door testing Airtightness budget Kickoff meeting Psi value Air Control Layer Articulation Condensation risk Energy recovery ventilation U- value Thermal bridging Vapor- open WRB Form factor Thermal Control Layer
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Division 01
Ductwork tightness
Trash chutes
Podium construction
Enerphit
Oversized equipment
Constructability reviews
CAR dampers
Low load buildings
As-built energy model
Can-do attitude
Design charrettes
SS fasteners
Simulated double hung
Plenums and chases
Energy model
WUFI
PHPP
Moisture diffusion
Vapor Control Layer
Compartmentalization
Corequisites
Energy Star
Feasibility study
Balanced ventilation
Material substitutions
Indoor Air Plus
Ind
Vented dryer
Integrated project delivery
Water Shedding Layer
Tilt and turn window
All-electric ready
Performance-based
Continuous insulation
Mock-up
Bulk Water Control Layer
Blower door testing
Airtightness budget
Kickoff meeting
Psi value
Air Control Layer
Articulation
Condensation risk
Energy recovery ventilation
U-value
Thermal bridging
Vapor-open WRB
Form factor
Thermal Control Layer