Blower door testing SS fasteners Trash chutes Thermal bridging Low load buildings CAR dampers Integrated project delivery Corequisites Material substitutions Kickoff meeting All- electric ready Plenums and chases Ductwork tightness Enerphit As-built energy model Energy model Performance- based U- value Airtightness budget Psi value Air Control Layer Moisture diffusion Thermal Control Layer Water Shedding Layer Division 01 Constructability reviews WUFI Continuous insulation Can-do attitude Balanced ventilation PHPP Form factor Podium construction Tilt and turn window Energy Star Ind Compartmentalization Condensation risk Energy recovery ventilation Vapor Control Layer Mock- up Articulation Oversized equipment Design charrettes Vented dryer Feasibility study Indoor Air Plus Vapor- open WRB Bulk Water Control Layer Simulated double hung Blower door testing SS fasteners Trash chutes Thermal bridging Low load buildings CAR dampers Integrated project delivery Corequisites Material substitutions Kickoff meeting All- electric ready Plenums and chases Ductwork tightness Enerphit As-built energy model Energy model Performance- based U- value Airtightness budget Psi value Air Control Layer Moisture diffusion Thermal Control Layer Water Shedding Layer Division 01 Constructability reviews WUFI Continuous insulation Can-do attitude Balanced ventilation PHPP Form factor Podium construction Tilt and turn window Energy Star Ind Compartmentalization Condensation risk Energy recovery ventilation Vapor Control Layer Mock- up Articulation Oversized equipment Design charrettes Vented dryer Feasibility study Indoor Air Plus Vapor- open WRB Bulk Water Control Layer Simulated double hung
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Blower door testing
SS fasteners
Trash chutes
Thermal bridging
Low load buildings
CAR dampers
Integrated project delivery
Corequisites
Material substitutions
Kickoff meeting
All-electric ready
Plenums and chases
Ductwork tightness
Enerphit
As-built energy model
Energy model
Performance-based
U-value
Airtightness budget
Psi value
Air Control Layer
Moisture diffusion
Thermal Control Layer
Water Shedding Layer
Division 01
Constructability reviews
WUFI
Continuous insulation
Can-do attitude
Balanced ventilation
PHPP
Form factor
Podium construction
Tilt and turn window
Energy Star
Ind
Compartmentalization
Condensation risk
Energy recovery ventilation
Vapor Control Layer
Mock-up
Articulation
Oversized equipment
Design charrettes
Vented dryer
Feasibility study
Indoor Air Plus
Vapor-open WRB
Bulk Water Control Layer
Simulated double hung