Kickoff meeting Energy model Integrated project delivery Moisture diffusion Continuous insulation Plenums and chases Form factor Vapor Control Layer Mock- up All- electric ready Water Shedding Layer Oversized equipment Podium construction Compartmentalization PHPP Tilt and turn window Energy Star As-built energy model Division 01 Thermal bridging Corequisites Material substitutions Blower door testing Bulk Water Control Layer Indoor Air Plus CAR dampers Constructability reviews Balanced ventilation WUFI Articulation Low load buildings Air Control Layer Enerphit Feasibility study Vapor- open WRB Airtightness budget Energy recovery ventilation Can-do attitude Trash chutes U- value Condensation risk Ind Vented dryer Psi value Performance- based Thermal Control Layer Design charrettes Simulated double hung Ductwork tightness SS fasteners Kickoff meeting Energy model Integrated project delivery Moisture diffusion Continuous insulation Plenums and chases Form factor Vapor Control Layer Mock- up All- electric ready Water Shedding Layer Oversized equipment Podium construction Compartmentalization PHPP Tilt and turn window Energy Star As-built energy model Division 01 Thermal bridging Corequisites Material substitutions Blower door testing Bulk Water Control Layer Indoor Air Plus CAR dampers Constructability reviews Balanced ventilation WUFI Articulation Low load buildings Air Control Layer Enerphit Feasibility study Vapor- open WRB Airtightness budget Energy recovery ventilation Can-do attitude Trash chutes U- value Condensation risk Ind Vented dryer Psi value Performance- based Thermal Control Layer Design charrettes Simulated double hung Ductwork tightness SS fasteners
(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
Kickoff meeting
Energy model
Integrated project delivery
Moisture diffusion
Continuous insulation
Plenums and chases
Form factor
Vapor Control Layer
Mock-up
All-electric ready
Water Shedding Layer
Oversized equipment
Podium construction
Compartmentalization
PHPP
Tilt and turn window
Energy Star
As-built energy model
Division 01
Thermal bridging
Corequisites
Material substitutions
Blower door testing
Bulk Water Control Layer
Indoor Air Plus
CAR dampers
Constructability reviews
Balanced ventilation
WUFI
Articulation
Low load buildings
Air Control Layer
Enerphit
Feasibility study
Vapor-open WRB
Airtightness budget
Energy recovery ventilation
Can-do attitude
Trash chutes
U-value
Condensation risk
Ind
Vented dryer
Psi value
Performance-based
Thermal Control Layer
Design charrettes
Simulated double hung
Ductwork tightness
SS fasteners