This bingo card has 30 words: Free!, Positives, Busy presentation, mostly text, but kept Veeva logo, Confirmed UAT will be handled by the customer, though we would put together a plan, Will do his own verification of what was loaded, Timing, No slides on roles, ownership, or time requirements, Did try to keep the customer on-track, Testing, Would look at documents in the Vault, and verify that what was loaded looks good, Considered when to do UI vs automated options to scale, Caught Jackson’s comment about 100k -> 10m documents, Didn’t catch scope exactly, Date assumption “that was a guess”, Needs to confirm, Kept trying to keep things on-target, Types of people: Extractors/SMEs, Can’t speak to allocation exactly, Uncomfortable with timing, Bounced around a bit on answers, somewhat non-commital, Vault Version, Didn’t get them, but had the base concept, LifeCycle, Would have done different – Would have learned more, but didn’t understand enough about the Vault tool (experience), Would have wanted the experience, Time spent: 10-12hrs, Busy schedule, officiating a wedding, Toughest part – Not knowing the product, Difficult to consult unless knowing the why and 4-6mo for a project w/ 5mil documents.
What Would You Do? (Retail Edition) | Reading Reflection | OARS | Customer Connection!! | Process Bingo
Share this URL with your players:
For more control of your online game, create a clone of this card first.
Learn how to conduct a bingo game.
With players vying for a you'll have to call about __ items before someone wins. There's a __% chance that a lucky player would win after calling __ items.
Tip: If you want your game to last longer (on average), add more unique words/images to it.