Lean Manufacturing LINGO BINGO

Lean Manufacturing LINGO BINGO Card
Preview

This bingo card has a free space and 24 words: FIXED POSITION PRODUCTION, BOTTLENECK, PERFECTION / ZERO DEFECTS, WORK IN PROCESS, DEMAND & FORECAST, VALUE STREAM, ENABLE FLOW, WORKLOAD LEVELING, NON-VALUE ADD, COST OF GOODS SOLD, ASSEMBLY LAYOUT, PULL TO DEMAND, MASS PRODUCTION, MACHINE UTILIZATION, CROSSTRAINING, 6S & WORKPLACE ORGANIZATION, GO & SEE APPROACH, CYCLE TIME, DRIVE VALUE, BILL OF MATERIAL, JOB SHOP PRODUCTION, THROUGHPUT, PRODUCT FLEXIBILITY and PRODUCTIVITY.

More like this:

Marxism Bingo (Some of these are tricks!) | Economic Concepts Bingo | VROI | VROI BINGO | Lean Manufacturing

Play Online

Share this URL with your players:

For more control of your online game, create a clone of this card first.

Learn how to conduct a bingo game.

Call List

Probabilities

With players vying for a you'll have to call about __ items before someone wins. There's a __% chance that a lucky player would win after calling __ items.

Tip: If you want your game to last longer (on average), add more unique words/images to it.