This bingo card has a free space and 34 words: the company's business plan, knowing all team skills, something that limits system throughput, root cause analysis, calculating time changes per machine, elapsed time from customer order to the time product or service is rendered, reassign one of the operators from the overstaffed workstation, when packaging material will be required for a product, focusing improvement on maintenance skills, part level number, identify and eliminate waste (non-value added), re-allocate equipment and human resources, build a team of like minded people, mechanical breakdown, 12.5 parts per hour, by asking the supervisor, when packaging material will be required for a product, 20 days, be free to add their ideas and input during the entire process, training matrix or database, 5S, establishing direction, aligning people, and motivating and inspiring others, determine what the production goals should be, ask the supervisor if using the similar fasteners is acceptable, inform the supervisor that the correct material is not available, priority jobs, Assembly, 2.205 inches, measuring and tracking progress, reduces costs through inventory management, units produced/hours worked, difference between maximum and minimum values in a data set, safety and system performance and 1.788 inches.
⚠ This card has duplicate items: when packaging material will be required for a product (2)
Manufacturing Prep Last | Chemical Engineering Part 1 | Economics Bingo | Workshop 3- #1 | Bingo
Share this URL with your players:
For more control of your online game, create a clone of this card first.
Learn how to conduct a bingo game.
With players vying for a you'll have to call about __ items before someone wins. There's a __% chance that a lucky player would win after calling __ items.
Tip: If you want your game to last longer (on average), add more unique words/images to it.