This bingo card has a free space and 130 words: Material Master, Bill of Materials (BOM), Routing, Planned Orders, Purchase Requisition, Safety Stock, MRP Run, Lead Time, Lot Sizing, PIR (Planned Independent Requirements), Procurement Type, Forecast, Capacity Planning, Work Center, Scheduling, Net Change Planning, Regenerative Planning, Demand, Stockout, Scrap Factor, Planning Horizon, Inventory, Reorder Point, Production, Warehouse, Dependent Requirements, Available Stock, Order Proposal, In-House Production, External Procurement, Inventory, Procurement, Lead time, Supply chain, Demand forecast, Production, BOM (Bill of Materials), Routing, Capacity, Planning, Scheduling, Master data, Stock, Safety stock, Reorder point, Purchase requisition, Work order, Supplier, Material, Lot size, Net requirements, Availability check, Component, Distribution, Warehouse, Release strategy, Dependent demand, Finished goods, Semi-finished goods, Raw materials, Allocation, Production plan, ATP (Available to Promise), Gross requirements, Capacity utilization, Shop floor, Work center, Manufacturing planning, Sales order, Resource, Scrap, Exception message, Plan explosion, Material master, Scheduling agreement, Order confirmation, Backflush, Forecasting, Assembly, Lot-for-lot, Inventory, Procurement, Lead time, Supply chain, Demand forecast, Production, BOM (Bill of Materials), Routing, Capacity, Planning, Scheduling, Master data, Stock, Safety stock, Reorder point, Purchase requisition, Work order, Supplier, Material, Lot size, Net requirements, Availability check, Component, Distribution, Warehouse, Release strategy, Dependent demand, Finished goods, Semi-finished goods, Raw materials, Allocation, Production plan, ATP (Available to Promise), Gross requirements, Capacity utilization, Shop floor, Work center, Manufacturing planning, Sales order, Resource, Scrap, Exception message, Plan explosion, Material master, Scheduling agreement, Order confirmation, Backflush, Forecasting, Assembly and Lot-for-lot.
⚠ This card has duplicate items: Routing (3), Scheduling (3), Inventory (3), Production (3), Warehouse (3), Procurement (2), Lead time (2), Supply chain (2), Demand forecast (2), BOM (Bill of Materials) (2), Capacity (2), Planning (2), Master data (2), Stock (2), Safety stock (2), Reorder point (2), Purchase requisition (2), Work order (2), Supplier (2), Material (2), Lot size (2), Net requirements (2), Availability check (2), Component (2), Distribution (2), Release strategy (2), Dependent demand (2), Finished goods (2), Semi-finished goods (2), Raw materials (2), Allocation (2), Production plan (2), ATP (Available to Promise) (2), Gross requirements (2), Capacity utilization (2), Shop floor (2), Work center (2), Manufacturing planning (2), Sales order (2), Resource (2), Scrap (2), Exception message (2), Plan explosion (2), Material master (2), Scheduling agreement (2), Order confirmation (2), Backflush (2), Forecasting (2), Assembly (2), Lot-for-lot (2)
MRP Bingo | Fishbowl Bingo | Fishbowl Bingo | Fishbowl Bingo | Buzzword Bingo
Share this URL with your players:
For more control of your online game, create a clone of this card first.
Learn how to conduct a bingo game.
With players vying for a you'll have to call about __ items before someone wins. There's a __% chance that a lucky player would win after calling __ items.
Tip: If you want your game to last longer (on average), add more unique words/images to it.