(Print) Use this randomly generated list as your call list when playing the game. There is no need to say the BINGO column name. Place some kind of mark (like an X, a checkmark, a dot, tally mark, etc) on each cell as you announce it, to keep track. You can also cut out each item, place them in a bag and pull words from the bag.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
Someone asks “What actually happens today?”
Someone says “Back to current state”
Someone says “We need data”
Someone says “Let’s stay in scope”
Someone says “We walk this over there for one signature”
Someone says “Let’s not fix it yet”
A step gets renamed because everyone calls it something different
Someone says “Great catch”
A confusing step is broken into 2–3 clear steps
A sticky note falls off the wall
Someone says “Where do we start?”
Phone comes out (mark silently)
“Constraint” gets identified
“Jumping to solutions” moment (mark silently)
Someone says “That’s a long lead item”
Tape measure appears
“Rework” gets mentioned
“Queue” gets mentioned
A waste is identified with a real example
Someone says “That’s out of scope”
Someone says “We should measure that”
Someone says “This sits until…”
Someone says “We need real data for that”
Operator insight changes the map
A step is clarified and everyone agrees
A stopwatch/timer shows up
Someone realizes two steps are duplicated
Someone says “That’s a workaround”
“Current state” gets said 3+ times in 5 minutes
Someone says “That’s not value added”
Someone takes a photo of the map
Someone says “Add it to the current state”
The brown paper roll becomes the main character
Someone says “Wait—what triggers this step?”
Someone says “Let’s time it”
Someone says “Engineering change / revision”
Someone mentions the mezzanine location
Someone says “We’re hunting parts”
Someone says “This waits for one missing part”
“5S” gets mentioned
Someone says “Forklift route”
“Bottleneck” gets identified
Someone says “Crating spec”
A Post it “avalanche” happens
Someone says “Stockroom location”
A “quick question” becomes a mini discussion
“Batching” gets mentioned
Someone mentions breakfast
Someone says “We need to define ‘done’”
“Standard work” gets mentioned
Someone says “We need a better layout”
Someone says “Wrong revision”
Someone says “It depends”
“Hand off” gets mentioned
Someone says “Let’s keep moving”
Someone says “That’s a quick win”
Someone says “This is the real process, not the ideal process”